Power
On-site generation strategy
- Campus planned around an on-site generation strategy, with interconnection and backup architecture defined during engineering.
- Electrical topology, redundancy, and delivery sequencing are defined per phase and documented in the site exhibit.
- Phase sizing is being shaped through customer engagement rather than fixed in advance.


